A Confused Path Forward
NASA’s move toward phased development of the space shuttle was a clear indication that the shuttle studies to that point had failed to identify a shuttle design that would both fit within the anticipated budget during the 1970s and that NASA’s engineers were confident could be successfully developed. This realization put the space agency in a rather difficult position. A year had been spent studying shuttle designs that turned out to be neither politically nor technically acceptable. Yet Jim Fletcher and George Low were convinced that a decision to go ahead with the shuttle had to be made by the end of 1971 if NASA were to hold together the engineering design and development teams, both within the agency and in its contractors, required to undertake the shuttle program. They found themselves, six months before that deadline, without a specific shuttle design to put forward for approval. Fletcher and Low at several points in summer 1971 gave serious consideration to pulling the plug on seeking approval for shuttle development, instead putting forward some alternative, less ambitious human space flight effort during the 1970s. Ultimately they rejected this fallback position and decided to press forward with the attempt to find a shuttle program that both made sense in terms of NASA’s future ambitions and was acceptable to the White House. Meanwhile, there were several related developments that would influence the eventual outcome of the shuttle decision process.