THE SPIDER

Apollo 9 was to be the ‘D’ mission – a lunar module manned flight demonstration in Earth orbit. The payload for the AS-504 launch vehicle was CSM-104 and LM-3. As they were to operate independently, the spacecraft were given radio call-signs. The blue wrapping of the command module for its shipment to the Cape had given it the appearance of a sweet, so it was named ‘Gumdrop’. The arachnid-like configuration of the lunar module prompted the name ‘Spider’.

The launch was scheduled for 28 February 1969 and the countdown was begun at 03:00:00 GMT on 27 February with 28 hours on the clock, but 30 minutes into the planned 3-hour hold at T-16 hours the clock was recycled to T-42 hours in order to enable the crew of James McDivitt, David Scott and Rusty Schweickart to recover from a mild respiratory infection. The count picked up at 07:30:00 on 1 March and the vehicle lifted off from Pad 39A on time at 16:00:00 GMT on 3 March.

The ascent was nominal and at S-IVB cutoff at T+664.66 seconds the deviations were +2.86 ft/sec in velocity and -0.17 nautical mile in altitude, with the result that the initial orbit was almost perfect at 100 nautical miles. At 002:41:16.0 the S-IVB released the CSM, which moved clear, turned end over end to aim its apex at the top of the LM and moved back in. At 003:01:59.3 it docked at the first attempt, marking the first use of this apparatus. Once the tunnel between the two spacecraft had been pressurised, the crew opened the apex hatch of the command module to confirm that all the latches on the docking ring had engaged, and after lines had been connected to supply power to the dormant LM the hatch was reinstalled. On a command issued by the CSM at 004:08:09 the S-IVB released the docked combination.

Preparing the CSM-104 and LM-3 spacecraft for the Apollo 9 mission.

Apollo 9’s S-IVB with the Lunar Module ‘Spider’ exposed.

After the spacecraft was clear, the S-IVB reignited its engine at 004:45:55.5 to raise an apogee of 1,672 nautical miles. Then, after a period of coasting to allow the engine to cool down, it initiated a final burn at 006:07:19.3 to achieve a velocity of 31,620 ft/sec which would send it into solar orbit.

Meanwhile, at 005:59:01.1 a 5.2-second burn by the service propulsion system raised the spacecraft’s orbit to 111 x 128 nautical miles. Three further manoeuvres on the second day in space measured the oscillatory response of the docked vehicles to obtain data designed to improve the autopilot’s response in this configuration, and also burned off the CSM’s propellant to increase the fidelity of manoeuvres which it would later perform in Earth orbit to rehearse what a mission would do in lunar orbit.

On the third day in space, Schweickart entered the LM to check out its systems. McDivitt joined him 50 minutes later. At about 045:52, shortly after the landing gear was deployed, McDivitt advised Mission Control that Schweickart had twice been sick – this illness would have an impact on the EVA planned for later in the mission. At 046:28 the astronauts made a 5-minute TV transmission from inside the LM. The descent engine was ignited at 049:41:34.5 for a 371.5-second burn in which the autopilot controlled the attitude of the docked vehicles and the astronauts manually throttled the engine to full thrust. The LM was deactivated at 051:00. Several hours later, a service propulsion system burn achieved an almost circular orbit of 125.9 x 131.0 nautical miles in preparation for the rendezvous sequence.

The EVA plan had called for Schweickart to exit the LM’s forward hatch, transfer to the command module hatch, and then return. But owing to his bouts of nausea the spacewalk was cut back from 2 hours 15 minutes to just 39 minutes, to be made on a single daylight pass. The LM was depressurised at 072:45, and the hatch opened at 072:46. Schweickart initiated his egress at 72:59:02, feet first and face up, and was completely out by 073:07. He was wearing the Extravehicular Mobility Unit suit and Portable Life Support System backpack which astronauts were to wear on the lunar surface. A 25-foot nylon safety tether precluded him drifting away. For stability, he inserted his feet into a pair of ‘golden slippers’ on the ‘porch’ of the descent stage. Meanwhile, at 073:02:00 Scott opened the side hatch of the command module and poked his head and shoulders out to monitor Schweickart. Although the transfer to the command module hatch had been cancelled, Schweickart was able to make an abbreviated study of translation and body-attitude-control using handrails affixed to the upper part of the LM. Before ingressing, Schweickart shot 16-mm movie footage of Scott’s activities, and 70-mm Hasselblad pictures of the exterior of both vehicles. Although the EVA was brief and did not involve a period of orbital darkness, it was sufficient to certify the suit and backpack for use on the lunar surface. The LM was repressurised at 073:53, and the CSM several minutes later. After a TV transmission from the LM that started at 074:58:03 and lasted 15 minutes, it was deactivated and McDivitt and Schweickart rejoined Scott.

On the fifth flight day McDivitt and Schweickart were back in the LM by 088:55 in order to prepare that ship for a period of free flight and an active rendezvous. At 092:22 the CSM oriented the pair into the attitude required for undocking. This was attempted at 092:38, but the latches did not fully release until 092:39:36. This was to be the first time that astronauts flew a spacecraft that was incapable of returning to Earth if an emergency were to arise – they relied on Scott to rescue them. Once free, the LM pirouetted while Scott made a visual inspection. At 093:02:54 the CSM used the thrusters of its reaction control system to make a separation manoeuvre. Over the next 6.3 hours, the LM undertook a series of manoeuvres which set up and executed a rendezvous. In the process, the descent propulsion system was fired under different control regimes and with the throttle being varied, after which the descent stage was jettisoned and the rendezvous was performed by the ascent stage. Terminal phase braking began at 098:30:03, and was followed by a period of station-keeping, then formation flying to facilitate mutual photography prior to docking at 099:02:26. McDivitt and Schweickart then transferred back to the CSM. The ascent stage was jettisoned at 101:22:45.0, and half an hour later ignited its main engine and fired it to depletion to enter a 126.6 x 3,760.9-nautical mile orbit.

The remainder of the mission was less hectic, being devoted mainly to conducting multispectral photography to prepare for the Skylab space station. At 169:30:00.4 the service propulsion system was fired in a 24.9-second burn which established the conditions for a nominal de-orbit. Unfavorable weather in the planned recovery area prompted a postponement of the de-orbit by one revolution, and it was performed at 240:31:14.8. The service module was jettisoned a few minutes later. The command module flew the entry profile under the control of its primary guidance system, and splashed into the Atlantic at 17:00:54 on 13 March about 2.7 nautical miles from the target. It settled in the ideal apex-up flotation attitude, and within an hour the crew were onboard USS Guadalcanal.